Members Present: 10
E-Board Present: Mike, Matt, Todd, Zack
Meeting Start: 20:03
- Welcome!
- Field Trips
- Pick a day for Negaunee
- Sometime in October
- Sunday the 29th
- Leaving in the morning, 9AM
- Amount of people interested: 10 so far
- Figure out rides as we get closer
- Shack
- Thanks to those that picked up the corner near the window
- Fridge is pretty empty
- Matt will be picking up more cases of pop
- Cans need to get returned
- Pop is 50 cents, honor system
- Please place cans in the returnable bags
- Coffee is 25 cents, if you want to try…
- Events
- Foxhunt
- Antenna prototype constructed
- 4 element Yagi
- Took about 3 hours to make
- C4 Color Tour
- Think we are in pretty good shape
- 95% finished with assignments
- SET
- This weekend
- Got surprise assignment
- Need to transmit a message to the state EOC via voice on HF at 9:45 AM
- Has to be sent using an unfamiliar protocol
- 932 MHz Primary or 7.232 MHz Backup or can relay it on 145.39 MHz
- Or could use SW1 on DMR
- Over voice only, not digital
- If you feel like struggling, let Chris know!
- LSPR
- 3 Weeks (October 20-21)
- If interested sign up online
- If you want to be untraditionally assigned, let Chris know directly, still sign up online
- May go testing in the next 2.5 weeks at Teepee tower and Herman Nestoria
- If you want to drive in circles and talk on the radio, let Chris know.
- Exams
- Sunday October 1st in Fisher 326 at Noon
- HARC Sponsored Exam
- Need to take exam by this date to receive it for the Rally
- Saturday October 7th at 8:00 AM at Franklin Township Hall
- CCRAA Sponsored Exam
- KCRA Meeting
- October 11th
- Gary’s House
- DMR Net
- Interest in doing it
- Day and Time:
- Tuesday Night at 9 PM
- New Mexico Site Approves
- Kory, KE8AVN, introduces himself from New Mexico over radio to the new members
- The Tower Newsletter
- Get done sometime
- Shack renovation and Keweenaw Comms Project main topics
- Need to plan a trip to CAFB before winter for maintenance
- Might be after Rally
- Arcadian Tower
- Tuesday (9/26) some engineering firms performed a study
- It will be a while before the results are released
- All options are on the table
- Sunday October 1st in Fisher 326 at Noon
- Antenna prototype constructed
- Foxhunt
- Pick a day for Negaunee
Meeting Adjourned: 20:57